Description
Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckle system, Flowline SE is the workhorse of trail helmets.
Specifications:
– 3-Way adjustable screwless visor
– Mips® B-Series Rotational Impact Brain Protection System
– Full 360-degree fit retention system with 3-way rear height adjustment
– 14 vents for maximum airflow
– Full wrap in-mold construction
– Extended Coverage MTB Trail Helmet
– Fidlock® Magnetic Buckle System
– Dual Density EPS for low and high-speed impacts
– Anti-microbial Quick Dry Premium Liner
– Side strap adjusters










Reviews
There are no reviews yet.