FLOWLINE SE BADGE MIPS HELMET OLIVE/INDIGO

RM588.00

Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckle system, Flowline SE is the workhorse of trail helmets. Specifications:• 3-Way adjustable screwless visor• Mips® B-Series Rotational Impact Brain Protection System• Full 360-degree fit retention system with 3-way rear height adjustment• 14 vents for maximum airflow• Full wrap in-mold construction• Extended Coverage MTB Trail Helmet• Side strap adjusters

SKU: 11056805
Category:

Description

Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckle system, Flowline SE is the workhorse of trail helmets.

Specifications:
• 3-Way adjustable screwless visor
• Mips® B-Series Rotational Impact Brain Protection System
• Full 360-degree fit retention system with 3-way rear height adjustment
• 14 vents for maximum airflow
• Full wrap in-mold construction
• Extended Coverage MTB Trail Helmet
• Side strap adjusters

Additional information

Weight 1.00 kg
Dimensions 50.00 × 40.00 × 40.00 cm
SIZE

MEDIUM/LARGE, XLARGE/XXL

Reviews

There are no reviews yet.

Be the first to review “FLOWLINE SE BADGE MIPS HELMET OLIVE/INDIGO”

Your email address will not be published. Required fields are marked *